6.6 Coating of a bathroom with epoxy floor
General
This coating work method is indicative and deals with the coating of a floor coated with epoxy in the bathroom with the ELAPROOF + SAND system. The ELAPROOF + SAND floor covering system consists of ELAPROOF PRIMER primer, ELAPROOF + SAND floor covering and ELACOAT TOPCOAT RAL / ELACOAT TOPCOAT topcoat.
The coating work method is not a repair plan or a construction plan. The overall design of the coating is always the responsibility of the site-specific designer.
Platform refurbishment
The floor coated with epoxy in the bathroom must be less than 10 years old during the coating phase, based on Finnish RIL 107-2012 guideline. Please check if there are any similar restrictions in the local regulations and follow those.
Any cracks in the epoxy-coated bathroom floor are first treated by soldering them. After the solder resin has dried, the floor coated with epoxy is mechanically sanded.
The sanded epoxy-coated floor is washed with a general-purpose cleaner and rinsed with plenty of water. The cleaned floor is allowed to dry for at least 2 hours before starting the coating.
Sealing
If necessary, the seals of all structural joints and boundary points such as bushings and columns, etc. are implemented with a combination of ELAPROOF INDOOR + ELAPROOF BASE FABRIC.
ELAPROOF INDOOR must be mixed before starting the seals. Use a whisk in the mixer that does not take air into the sealant when mixing, e.g. COLLOMIX KR series mixing paddle.
Apply ELAPROOF INDOOR sealant with a brush and press ELAPROOF BASE FABRIC onto the fresh compound so that all air escapes under the support fabric. Apply another coat of ELAPROOF INDOOR.
If the sealable bushings allow the pre-formed bushing to be threaded over the bushing into a collar, the bushings can be shaped, if necessary, for example, by cutting from N1 or N2 category geo-textiles, unless the ELAPROOF BASE FABRIC is wide enough to carry the penetration. ELAPROOF ROOF series reinforcement fabrics, available in widths of 150 mm, 350 mm, and 1000 mm, can also be used for seals.
Coating
Before starting the coating, the ELAPROOF + SAND floor covering must be mixed. Use a mixing paddle in the mixer that does not take air into the sealant when mixing, eg COLLOMIX KR series mixing paddle.
The primed substrate is coated with ELAPROOF + SAND (M1 / EC 1) floor coating. The coating is applied to the substrate with a steel spatula.
ELAPROOF + SAND floor covering is applied to the substrate in two separate applications. The consumption of each application must be at least approx. 2.0 kg / m2 , in which case the total consumption is approx. 4.0 kg / m2 . The actual dry film thickness must be min. 2.0 mm.
The drying time between coats of ELAPROOF + SAND depends largely on the conditions at the installation site. At conditions of approx. + 20 °C, 50% RH can be applied a second time approx. 5 h after the first application. Lower temperatures and higher humidity significantly extend the drying time.
The ELAPROOF + SAND floor covering applied twice can be applied after approx. 12 hours in conditions + 20 °C, 50 % RH.
Topcoat
The dried ELAPROOF coating is treated with clear ELACOAT TOPCOAT or tinted ELACOAT TOPCOAT RAL topcoats to facilitate cleaning and maintenance. For monochromatic floors, we recommend topcoating with tinted ELACOAT TOPCOAT RAL topcoat to even out any colour differences in the ELAPROOF + SAND coating. On flaked floors, we recommend flaking with ELAPROOF Art&Deco Colour Chips on wet ELACOAT TOPCOAT RAL topcoat and, after drying, finishing with clear ELACOAT TOPCOAT topcoat.
In the topcoat, the topcoat component A is first mixed for 1 to 2 minutes, then the hardener component B is added to the mixed A component and mixed again for 2-3 minutes. Use, for example, the COLLOMIX KR series mixing paddle for mixing.
The mixture is applied on top of the dried ELAPROOF coating with a short-pile roller (6 – 7 mm) by cross-rolling. The consumption of the topcoat is approx. 110 – 200 g / m2 / application, depending on the degree of roughness of the selected ELAPROOF + SAND coating. The topcoat is dry to dry after approx. 16 h at + 20 °C, 50% RH. The full duration of mechanical stress is achieved under the above conditions in about 4 days and the full chemical duration in about 7 days.
NOTE! Some shades of ELACOAT TOPCOAT RAL topcoats may require 2 to 3 coats to achieve sufficient coverage! See a separate table for the coverage of ELACOAT TOPCOAT RAL topcoats.
Build Care Oy owns all rights to this coating work method. Designers are free to use this coating work method when creating repair and coating plans!
ALWAYS READ THE PRODUCT DESCRIPTIONS FOR THE PRODUCTS PRESENTED IN THE COATING WORK METHOD BEFORE STARTING THE INSTALLATION!
Structural drawings
All structural drawings related to ElaProof products in DWG and PDF format from the ProdLib-service.
Updated: 12/2021 | JKo
6.5 Coating of a Bathroom with Plastic Carpet Flooring
General
This coating work method is indicative and deals with the coating of a bathroom with plastic carpet flooring with the ELAPROOF+SAND system. The ELAPROOF+SAND floor covering system consists of ELAPROOF PRIMER primer, ELAPROOF+SAND floor covering and ELACOAT TOPCOAT RAL / ELACOAT TOPCOAT topcoat
The coating work method is not a repair plan or a construction plan. The overall design of the coating is always the responsibility of the site-specific designer.
Platform refurbishment
The floor covered with plastic carpet in the bathroom must be less than 10 years old at the coating stage, based on Finnish RIL 107-2012 guidelines. Please check if there are any similar restrictions in the local regulations and follow those! In addition, it must be ascertained whether the PUR protective coating used on a plastic mat, which may impair the adhesive strength of the coatings. If the plastic mat has a PUR coating or cannot be resolved, it is recommended to perform a separate adhesion test with ELAPROOF+SAND floor coating.
The floor covered with a plastic mat is first washed with an acidic (pH 1 – 3) detergent for cleaning the tile surfaces and then with an alkaline (pH 8 – 11) detergent and rinsed with plenty of water. The cleaned floor is allowed to dry for at least 1 day before starting the coating.
Sealing
If necessary, all structural joints and boundary points such as floor and wall joints, bushings, columns, and seals of any floor wells, etc. are implemented with a combination of ELAPROOF INDOOR + ELAPROOF BASE FABRIC.
ELAPROOF INDOOR must be mixed before starting the seals. Use a whisk in the mixer that does not take air into the sealant when mixing, eg COLLOMIX KR series mixing paddle.
Apply ELAPROOF INDOOR sealant with a brush and press ELAPROOF BASE FABRIC onto the fresh compound so that all air escapes under the support fabric. Apply another coat of ELAPROOF INDOOR.
Sealing of one running meter (1 rmt) requires approx. 0.15 l of ELAPROOF INDOOR.
If the sealable bushings allow the pre-formed bushing to be threaded over the bushing into a collar, the bushings can be shaped, if necessary, for example, by cutting from N1 or N2 category geo-textiles, unless the ELAPROOF BASE FABRIC is wide enough to carry the penetration. ELAPROOF ROOF series reinforcement fabrics, available in widths of 150 mm, 350 mm and 1000 mm, can also be used for seals.
Coating
Before starting the coating, the ELAPROOF+SAND floor covering must be mixed. Use a mixing paddle in the mixer that does not take air into the sealant when mixing, eg COLLOMIX KR series mixing paddle.
The primed substrate is coated with ELAPROOF+SAND (M1 / EC 1) floor coating. The coating is applied to the substrate with a steel spatula.
ELAPROOF+SAND floor covering is applied to the substrate in two separate applications. The consumption of each application must be at least approx. 2.0 kg / m2, in which case the total consumption is approx. 4.0 kg / m2. The actual dry film thickness must be min. 2.0 mm.
The drying time between coats of ELAPROOF+SAND depends largely on the conditions at the installation site. At conditions of approx. + 20 °C, 50% RH can be applied a second time approx. 5 h after the first application. Lower temperatures and higher humidity significantly extend the drying time.
The ELAPROOF+SAND floor covering applied twice can be applied after approx. 12 hours in conditions + 20 °C, 50 % RH.
Topcoat
The dried ELAPROOF coating is treated with clear ELACOAT TOPCOAT or tinted ELACOAT TOPCOAT RAL topcoats to facilitate cleaning and maintenance. For monochromatic floors, we recommend topcoating with tinted ELACOAT TOPCOAT RAL topcoat to even out any colour differences in the ELAPROOF+SAND coating. On flaked floors, we recommend flaking with ELAPROOF Art&Deco Colour Chips on wet ELACOAT TOPCOAT RAL topcoat and, after drying, finishing with clear ELACOAT TOPCOAT topcoat.
In the topcoat, the topcoat component A is first mixed for 1 to 2 minutes, then the hardener component B is added to the mixed A component and mixed again for 2-3 minutes. Use, for example, the COLLOMIX KR series mixing paddle for mixing.
The mixture is applied on top of the dried ELAPROOF coating with a short-pile roller (6 – 7 mm) by cross-rolling. The consumption of the topcoat is approx. 110 – 200 g / m2 / application, depending on the degree of roughness of the selected ELAPROOF+SAND coating. The topcoat is dry to dry after approx. 16 h at + 20 °C, 50% RH. The full duration of mechanical stress is achieved under the above conditions in about 4 days and the full chemical duration in about 7 days.
NOTE! Some shades of ELACOAT TOPCOAT RAL topcoats may require 2 to 3 coats to achieve sufficient coverage! See a separate table for the coverage of ELACOAT TOPCOAT RAL topcoats.
Structural drawings
All structural drawings related to ElaProof products in DWG and PDF format from the ProdLib-service.
Build Care Oy owns all rights to this coating work method. Designers are free to use this coating work method when creating repair and coating plans!
ALWAYS READ THE PRODUCT DESCRIPTIONS FOR THE PRODUCTS PRESENTED IN THE COATING WORK METHOD BEFORE STARTING THE INSTALLATION!
Updated: 12/2021 | JKo
6.4 Coating of the Tiled Bathroom Floor
General
This coating work method is indicative and deals with the coating of a tiled bathroom floor with the ELAPROOF+SAND system. The ELAPROOF+SAND floor covering system consists of ELAPROOF PRIMER primer, ELAPROOF+SAND floor covering and ELACOAT TOPCOAT RAL / ELACOAT TOPCOAT topcoat
The coating work method is not a repair plan or a construction plan. The overall design of the coating is always the responsibility of the site-specific designer.
Platform refurbishment
The tiled floor in the bathroom must be waterproofed with approved waterproofing for use under the ceramic tiles. This waterproofing must not be more than 10 years old during the coating phase, based on Finnish RIL 107-2012 guideline. Please check if there are any similar restrictions in the local regulations and follow those?
The tile surfaces are washed first with an acidic (pH 1 – 3) detergent for cleaning the tile surfaces and then with an alkaline (pH 8 – 11) detergent and rinsed with plenty of water. The cleaned floor is allowed to dry for at least 1 day before starting the coating.
The silicone seams at the joint between the floor and the wall will be removed if the floor covering will extend over them.
Sealing
If necessary, all structural joints and boundary points such as floor and wall joints, bushings, columns, and seals of any floor wells, etc. are implemented with a combination of ELAPROOF INDOOR + ELAPROOF BASE FABRIC.
ELAPROOF INDOOR must be mixed before starting the seals. Use a whisk in the mixer that does not take air into the sealant when mixing, eg COLLOMIX KR series mixing paddle.
Apply ELAPROOF INDOOR sealant with a brush and press ELAPROOF BASE FABRIC onto the fresh compound so that all air escapes under the support fabric. Apply another coat of ELAPROOF INDOOR.
Sealing of one running meter (1 rmt) requires approx. 0.15 l of ELAPROOF INDOOR.
If the sealable bushings allow the pre-formed bushing to be threaded over the bushing into a collar, the bushings can be shaped, if necessary, for example, by cutting from N1 or N2 category geo-textiles, unless the ELAPROOF BASE FABRIC is wide enough to carry the penetration. ELAPROOF ROOF series reinforcement fabrics, available in widths of 150 mm, 350 mm and 1000 mm, can also be used for seals.
Coating
Before starting the coating, the ELAPROOF+SAND floor covering must be mixed. Use a mixing paddle in the mixer that does not take air into the sealant when mixing, eg COLLOMIX KR series mixing paddle.
The primed substrate is coated with ELAPROOF+SAND (M1 / EC 1) floor coating. The coating is applied to the substrate with a steel spatula.
ELAPROOF+SAND floor covering is applied to the substrate in two separate applications. The consumption of each application must be at least approx. 2.0 kg / m2, in which case the total consumption is approx. 4.0 kg / m2. The actual dry film thickness must be min. 2.0 mm.
The drying time between coats of ELAPROOF+SAND depends largely on the conditions at the installation site. At conditions of approx. + 20 °C, 50% RH can be applied a second time approx. 5 h after the first application. Lower temperatures and higher humidity significantly extend the drying time.
The ELAPROOF+SAND floor covering applied twice can be applied after approx. 12 hours in conditions + 20 °C, 50 % RH.
Topcoat
The dried ELAPROOF coating is treated with clear ELACOAT TOPCOAT or tinted ELACOAT TOPCOAT RAL topcoats to facilitate cleaning and maintenance. For monochromatic floors, we recommend topcoating with tinted ELACOAT TOPCOAT RAL topcoat to even out any colour differences in the ELAPROOF+SAND coating. On flaked floors, we recommend flaking with ELAPROOF Art&Deco Colour Chips on wet ELACOAT TOPCOAT RAL topcoat and, after drying, finishing with clear ELACOAT TOPCOAT topcoat.
In the topcoat, the topcoat component A is first mixed for 1 to 2 minutes, then the hardener component B is added to the mixed A component and mixed again for 2-3 minutes. Use, for example, the COLLOMIX KR series mixing paddle for mixing.
The mixture is applied on top of the dried ELAPROOF coating with a short-pile roller (6 – 7 mm) by cross-rolling. The consumption of the topcoat is approx. 110 – 200 g / m2 / application, depending on the degree of roughness of the selected ELAPROOF+SAND coating. The topcoat is dry to dry after approx. 16 h at + 20 °C, 50% RH. The full duration of mechanical stress is achieved under the above conditions in about 4 days and the full chemical duration in about 7 days.
NOTE! Some shades of ELACOAT TOPCOAT RAL topcoats may require 2 to 3 coats to achieve sufficient coverage! See a separate table for the coverage of ELACOAT TOPCOAT RAL topcoats.
Structural drawings
All structural drawings related to ElaProof products in DWG and PDF format from the ProdLib-service.
Build Care Oy owns all rights to this coating work method. Designers are free to use this coating work method when creating repair and coating plans!
ALWAYS READ THE PRODUCT DESCRIPTIONS FOR THE PRODUCTS PRESENTED IN THE COATING WORK METHOD BEFORE STARTING THE INSTALLATION!
Updated: 12/2021 | JKo
6.3 Concreate floor coating
General
This coating work method is indicative and deals with the coating of a concreate floor with the ELAPROOF+SAND system. The ELAPROOF+SAND floor covering system consists of ELAPROOF PRIMER primer, ELAPROOF+SAND floor covering and ELACOAT TOPCOAT RAL / ELACOAT TOPCOAT topcoat
The coating work method is not a repair plan or a construction plan. The overall design of the coating is always the responsibility of the site-specific designer.
Platform refurbishment
Adequate tensile and compressive strength is a key factor in the performance of coating materials. The concrete or screed substrate must be durable and have sufficient compressive strength.
The tensile strength of the substrate material is checked in accordance with EN 1542, and the tensile strength must be> 1.5 N / mm2 (1.5 MPa).
The compressive strength shall be checked in accordance with EN 12504-2, and the compressive strength shall be> 25 N / mm2 (25 MPa).
The substrate must be clean, sufficiently dry, and free of all contaminants such as dirt, oil, grease, weak coatings, and surface treatments.
If necessary, the weak layers are removed by sufficiently efficient mechanical methods such as grinding, milling, or blasting. In terms of coating, the best result is achieved if it is applied to a clean concrete surface with a roughness equivalent to a wood-ground concrete surface.
After cleaning, any cracks in the concrete floor are injected with injection resin meeting the EN 1504-5 standard, eg. HYDROPOX EP1.
Platform patching and levelling
Any cavities in the concrete surface are filled with a filling compound suitable for the coating combination before coating. If the concrete substrate to be coated has rough or uneven areas, they must be leveled with a leveling compound suitable for the coating combination. It should be noted that the irregularities tend to be visible on the coated surface.
Only special products that meet the above compressive and tensile strength requirements may be used to repair, straighten, and level the substrate. The suitability of the above products as a substrate for a liquid coating must always be ensured. from the product supplier.
Primer
Prior to coating, cleaned and repaired concreate substrates are primed with ELAPROOF PRIMER without the addition of water. Allow the primer to dry completely before applying ELAPROOF + SAND. The purpose of the primer is to seal the surface of the chipboard from the moisture released by the incoming coating.
Sealing
If necessary, all structural joints and boundary points such as floor and wall joints, bushings, columns and seals of any floor wells, etc. are implemented with a combination of ELAPROOF INDOOR + ELAPROOF BASE FABRIC.
ELAPROOF INDOOR must be mixed before starting the seals. Use a whisk in the mixer that does not take air into the sealant when mixing, eg COLLOMIX KR series mixing paddle.
Apply ELAPROOF INDOOR sealant with a brush and press ELAPROOF BASE FABRIC onto the fresh compound so that all air escapes under the support fabric. Apply another coat of ELAPROOF INDOOR.
Sealing of one running meter (1 rmt) requires approx. 0.15 l of ELAPROOF INDOOR.
If the sealable bushings allow the pre-formed bushing to be threaded over the bushing into a collar, the bushings can be shaped, if necessary, for example, by cutting from N1 or N2 category geo-textiles, unless the ELAPROOF BASE FABRIC is wide enough to carry the penetration. ELAPROOF ROOF series reinforcement fabrics, available in widths of 150 mm, 350 mm and 1000 mm, can also be used for seals.
Possible connections to the floor drain are also made by cutting the floor drain grommet from N1 or N2 class geo-textile or by cutting the reinforcement fabric of the ELAPROOF ROOF series. The bushing is installed using or ELAPROOF INDOOR compound. Apply ELAPROOF INDOOR sealant with a brush and press the grommet onto the fresh compound so that all air escapes under the backing fabric. Apply another coat of ELAPROOF INDOOR. When the bushing has dried, cut a hole of a suitable size for the bushing and press the floor drain clamping ring into place before starting the ELAPROOF+SAND floor covering.
Coating
Before starting the coating, the ELAPROOF+SAND floor covering must be mixed. Use a mixing paddle in the mixer that does not take air into the sealant when mixing, eg COLLOMIX KR series mixing paddle.
The primed substrate is coated with ELAPROOF+SAND (M1 / EC 1) floor coating. The coating is applied to the substrate with a steel spatula.
ELAPROOF+SAND floor covering is applied to the substrate in two separate applications. The consumption of each application must be at least approx. 2.0 kg / m2, in which case the total consumption is approx. 4.0 kg / m2. The actual dry film thickness must be min. 2.0 mm.
The drying time between coats of ELAPROOF+SAND depends largely on the conditions at the installation site. At conditions of approx. + 20 °C, 50% RH can be applied a second time approx. 5 h after the first application. Lower temperatures and higher humidity significantly extend the drying time.
The ELAPROOF+SAND floor covering applied twice can be applied after approx. 12 hours in conditions + 20 °C, 50 % RH.
Topcoat
The dried ELAPROOF coating is treated with clear ELAPROOF TOPCOAT or tinted ELACOAT TOPCOAT RAL topcoats to facilitate cleaning and maintenance. For monochromatic floors, we recommend topcoating with tinted ELACOAT TOPCOAT RAL topcoat to even out any color differences in the ELAPROOF + SAND coating. On flaked floors, we recommend flaking with ELAPROOF Art&Deco Colour Chips on wet ELACOAT TOPCOAT RAL topcoat and, after drying, finishing with clear ELACOAT TOPCOAT topcoat.
In the topcoat, the topcoat component A is first mixed for 1 to 2 minutes, then the hardener component B is added to the mixed A component and mixed again for 2-3 minutes. Use, for example, the COLLOMIX KR series mixing paddle for mixing.
The mixture is applied on top of the dried ELAPROOF coating with a short-pile roller (6 – 7 mm) by cross-rolling. The consumption of the topcoat is approx. 110 – 200 g / m2 / application, depending on the degree of roughness of the selected ELAPROOF + SAND coating. The topcoat is dry to dry after approx. 16 h at + 20 °C, 50% RH. The full duration of mechanical stress is achieved under the above conditions in about 4 days and the full chemical duration in about 7 days.
NOTE! Some shades of ELACOAT TOPCOAT RAL topcoats may require 2 to 3 coats to achieve sufficient coverage!
Structural drawings
All structural drawings related to ElaProof products in DWG and PDF format from the ProdLib-service.
Build Care Oy owns all rights to this coating work method. Designers are free to use this coating work method when creating repair and coating plans!
ALWAYS READ THE PRODUCT DESCRIPTIONS FOR THE PRODUCTS PRESENTED IN THE COATING WORK METHOD BEFORE STARTING THE INSTALLATION!
Updated: 12/2021 | JKo
6.2 Gypsum board floor coating
General
This coating work method is indicative and deals with the coating of a gypsum board floor with the ELAPROOF+SAND system. The ELAPROOF+SAND floor covering system consists of ELAPROOF PRIMER primer, ELAPROOF+SAND floor covering and ELACOAT TOPCOAT RAL / ELACOAT TOPCOAT topcoat.
The coating work method is not a repair plan or a construction plan. The overall design of the coating is always the responsibility of the site-specific designer.
Platform refurbishment
In areas to be renovated, all possible moisture-sensitive adhesive residues must be removed from the gypsum board floor. Any loose floor screeds must also be removed in their entirety.
Any gaps between the boards, screw holes and cracks in the board surfaces must be filled / levelled with a floor level suitable for gypsum board surfaces. A floor level suitable for chipboard surfaces should also be used for possible over-levelling. When using screeds, also check with the floor screed manufacturer for a suitable primer.
Primer
Prior to coating, cleaned and repaired gypsum board substrates are primed with ELAPROOF PRIMER without the addition of water. Allow the primer to dry completely before applying ELAPROOF + SAND. The purpose of the primer is to seal the surface of the chipboard from the moisture released by the incoming coating.
Sealing
If necessary, all structural joints and boundary points such as floor and wall joints, bushings, columns and seals of any floor wells, etc. are implemented with a combination of ELAPROOF INDOOR + ELAPROOF BASE FABRIC.
ELAPROOF INDOOR must be mixed before starting the seals. Use a whisk in the mixer that does not take air into the sealant when mixing, eg COLLOMIX KR series mixing paddle.
Apply ELAPROOF INDOOR sealant with a brush and press ELAPROOF BASE FABRIC onto the fresh compound so that all air escapes under the support fabric. Apply another coat of ELAPROOF INDOOR.
Sealing of one running meter (1 rmt) requires approx. 0.15 l of ELAPROOF INDOOR.
If the sealable bushings allow the pre-formed bushing to be threaded over the bushing into a collar, the bushings can be shaped, if necessary, for example, by cutting from N1 or N2 category geo-textiles, unless the ELAPROOF BASE FABRIC is wide enough to carry the penetration. ELAPROOF ROOF series reinforcement fabrics, available in widths of 150 mm, 350 mm and 1000 mm, can also be used for seals.
Coating
Before starting the coating, the ELAPROOF+SAND floor covering must be mixed. Use a mixing paddle in the mixer that does not take air into the sealant when mixing, eg COLLOMIX KR series mixing paddle.
The primed substrate is coated with ELAPROOF+SAND (M1 / EC 1) floor coating. The coating is applied to the substrate with a steel spatula.
ELAPROOF+SAND floor covering is applied to the substrate in two separate applications. The consumption of each application must be at least approx. 2.0 kg / m2, in which case the total consumption is approx. 4.0 kg / m2. The actual dry film thickness must be min. 2.0 mm.
The drying time between coats of ELAPROOF+SAND depends largely on the conditions at the installation site. At conditions of approx. + 20 °C, 50% RH can be applied a second time approx. 5 h after the first application. Lower temperatures and higher humidity significantly extend the drying time.
The ELAPROOF+SAND floor covering applied twice can be applied after approx. 12 hours in conditions + 20 °C, 50 % RH.
Topcoat
The dried ELAPROOF coating is treated with clear ELACOAT TOPCOAT or tinted ELACOAT TOPCOAT RAL topcoats to facilitate cleaning and maintenance. For monochromatic floors, we recommend topcoating with tinted ELACOAT TOPCOAT RAL topcoat to even out any colour differences in the ELAPROOF+SAND coating. On flaked floors, we recommend flaking with ELAPROOF Art&Deco Colour Chips on wet ELACOAT TOPCOAT RAL topcoat and, after drying, finishing with clear ELACOAT TOPCOAT topcoat.
In the topcoat, the topcoat component A is first mixed for 1 to 2 minutes, then the hardener component B is added to the mixed A component and mixed again for 2-3 minutes. Use, for example, the COLLOMIX KR series mixing paddle for mixing.
The mixture is applied on top of the dried ELAPROOF coating with a short-pile roller (6 – 7 mm) by cross-rolling. The consumption of the topcoat is approx. 110 – 200 g / m2 / application, depending on the degree of roughness of the selected ELAPROOF+SAND coating. The topcoat is dry to dry after approx. 16 h at + 20 °C, 50% RH. The full duration of mechanical stress is achieved under the above conditions in about 4 days and the full chemical duration in about 7 days.
NOTE! Some shades of ELACOAT TOPCOAT RAL topcoats may require 2 to 3 coats to achieve sufficient coverage! See a separate table for the coverage of ELACOAT TOPCOAT RAL topcoats.
Structural drawings
All structural drawings related to ElaProof products in DWG and PDF format from the ProdLib-service.
Build Care Oy owns all rights to this coating work method. Designers are free to use this coating work method when creating repair and coating plans!
ALWAYS READ THE PRODUCT DESCRIPTIONS FOR THE PRODUCTS PRESENTED IN THE COATING WORK METHOD BEFORE STARTING THE INSTALLATION!
Updated: 12/2021 | JKo
6.1 Chipboard- / OSB floor coating
General
This coating work method is indicative and deals with the coating of a chipboard- / OSB floor with the ELAPROOF + SAND system. The ELAPROOF+SAND Floor Covering system consists of ELAPROOF PRIMER primer, ELAPROOF+SAND Floor Covering and ELACOAT TOPCOAT RAL / ELACOAT TOPCOAT topcoat.
The coating work method is not a repair plan or a construction plan. The overall design of the coating is always the responsibility of the site-specific designer.
Platform refurbishment
In areas to be renovated, all possible moisture-sensitive adhesive residues must be removed from the chipboard- / OSB floor. Any loose floor screeds must also be removed in their entirety.
Any gaps between the boards, screw holes and cracks in the board surfaces must be filled / levelled with a floor level suitable for chipboard- / OSB surfaces. A floor level suitable for chipboard surfaces should also be used for possible over-levelling. When using screeds, also check with the floor screed manufacturer for a suitable primer.
Primer
Prior to coating, cleaned and repaired chipboard- / OSB substrates are primed with ELAPROOF PRIMER without the addition of water. Allow the primer to dry completely before applying ELAPROOF + SAND. The purpose of the primer is to seal the surface of the chipboard from the moisture released by the incoming coating.
Sealing
If necessary, all structural joints and boundary points such as floor and wall joints, bushings, columns and seals of any floor wells, etc. are implemented with a combination of ELAPROOF INDOOR + ELAPROOF BASE FABRIC.
ELAPROOF INDOOR must be mixed before starting the seals. Use a whisk in the mixer that does not take air into the sealant when mixing, eg. COLLOMIX KR series mixing paddle.
Apply ELAPROOF INDOOR sealant with a brush and press ELAPROOF BASE FABRIC onto the fresh compound so that all air escapes under the support fabric. Apply another coat of ELAPROOF INDOOR.
Sealing of one running meter (1 rmt) requires approx. 0.15 l of ELAPROOF INDOOR.
If the sealable bushings allow the pre-formed bushing to be threaded over the bushing into a collar, the bushings can be shaped, if necessary, for example, by cutting from N1 or N2 category geo-textiles, unless the ELAPROOF BASE FABRIC is wide enough to carry the penetration. ELAPROOF ROOF series reinforcement fabrics, available in widths of 150 mm, 350 mm and 1000 mm, can also be used for seals.
Coating
Before starting the coating, the ELAPROOF+SAND Floor Covering must be mixed. Use a mixing paddle in the mixer that does not take air into the sealant when mixing, eg. COLLOMIX KR series mixing paddle.
The primed substrate is coated with ELAPROOF + SAND (M1 / EC 1) floor coating. The coating is applied to the substrate with a steel spatula.
ELAPROOF+SAND Floor Covering is applied to the substrate in two separate applications. The consumption of each application must be at least approx. 2.0 kg /m2, in which case the total consumption is approx. 4.0 kg /m2. The actual dry film thickness must be min. 2.0 mm.
The drying time between coats of ELAPROOF + SAND depends largely on the conditions at the installation site. At conditions of approx. + 20 °C, 50% RH can be applied a second time approx. 5 h after the first application. Lower temperatures and higher humidity significantly extend the drying time.
The ELAPROOF+SAND Floor Covering applied twice can be applied after approx. 12 hours in conditions + 20 °C, 50 % RH.
Topcoat
The dried ELAPROOF coating is treated with clear ELAPROOF TOPCOAT or tinted ELACOAT TOPCOAT RAL topcoats to facilitate cleaning and maintenance. For monochromatic floors, we recommend topcoating with tinted ELACOAT TOPCOAT RAL topcoat to even out any color differences in the ELAPROOF + SAND coating. On flaked floors, we recommend flaking with ELAPROOF Art&Deco Colour Chips on wet ELACOAT TOPCOAT RAL topcoat and, after drying, finishing with clear ELACOAT TOPCOAT topcoat.
In the topcoat, the topcoat component A is first mixed for 1 to 2 minutes, then the hardener component B is added to the mixed A component and mixed again for 2-3 minutes. Use, for example, the COLLOMIX KR series mixing paddle for mixing.
The mixture is applied on top of the dried ELAPROOF coating with a short-pile roller (6 – 7 mm) by cross-rolling. The consumption of the topcoat is approx. 110 – 200 g / m2 / application, depending on the degree of roughness of the selected ELAPROOF + SAND coating. The topcoat is dry to dry after approx. 16 h at + 20 °C, 50% RH. The full duration of mechanical stress is achieved under the above conditions in about 4 days and the full chemical duration in about 7 days.
NOTE! Some shades of ELACOAT TOPCOAT RAL topcoats may require 2 to 3 coats to achieve sufficient coverage!
Structural drawings
All structural drawings related to ElaProof products in DWG and PDF format from the ProdLib-service.
Build Care Oy owns all rights to this coating work method. Designers are free to use this coating work method when creating repair and coating plans!
ALWAYS READ THE PRODUCT DESCRIPTIONS FOR THE PRODUCTS PRESENTED IN THE COATING WORK METHOD BEFORE STARTING THE INSTALLATION!
Updated: 12/2021 | JKo
4.5 Coating of the tiled bathroom wall
General
This coating work method is indicative and deals with the coating of a tiled bathroom wall with the ELAPROOF + SAND system. The ELAPROOF + SAND wall covering system consists of ELAPROOF PRIMER primer, ELAPROOF + SAND floor covering and ELACOAT TOPCOAT RAL / ELACOAT TOPCOAT topcoat
The coating work method is not a repair plan or a construction plan. The overall design of the coating is always the responsibility of the site-specific designer.
Platform refurbishment
The tiled wall in the bathroom must be waterproofed with approved waterproofing for use under the ceramic tiles. This waterproofing must not be more than 10 years old during the coating phase, based on Finnish RIL 107-2012 guideline. Please check if there are any similar restrictions in the local regulations and follow those!
The tile surfaces are washed first with an acidic (pH 1 – 3) detergent for cleaning the tile surfaces and then with an alkaline (pH 8 – 11) detergent and rinsed with plenty of water. The cleaned wall is allowed to dry for at least 1 day before starting the coating.
The silicone seams at the joint between the wall and the floor will be removed if the wall covering will extend over them.
Seals
If necessary, all structural joints and boundary points such as floor and wall joints, bushings, columns, and seals of any floor wells, etc. are implemented with a combination of ELAPROOF INDOOR + ELAPROOF SUPPORT FABRIC.
ELAPROOF INDOOR must be mixed before starting the seals. Use a whisk in the mixer that does not take air into the sealant when mixing, eg COLLOMIX KR series mixing paddle.
Apply ELAPROOF INDOOR sealant with a brush and press ELAPROOF SUPPORT FABRIC onto the fresh compound so that all air escapes under the support fabric. Apply another coat of ELAPROOF INDOOR.
Sealing of one running meter (1 m) requires approx. 0.15 l of ELAPROOF INDOOR.
If the sealable bushings allow the pre-formed bushing to be threaded over the bushing into a collar, the bushings can be shaped, if necessary, for example, by cutting from N1 or N2 category geo-textiles, unless the ELAPROOF SUPPORT FABRIC is wide enough to carry the penetration. ELAPROOF ROOF series reinforcement fabrics, available in widths of 150 mm, 350 mm and 1000 mm, can also be used for seals.
Coating
Before starting the coating, the ELAPROOF + SAND floor covering must be mixed. Use a mixing paddle in the mixer that does not take air into the sealant when mixing, eg COLLOMIX KR series mixing paddle.
The primed substrate is coated with ELAPROOF + SAND (M1 / EC 1) floor coating. The coating is applied to the substrate with a steel spatula.
ELAPROOF + SAND floor covering is applied to the substrate in two separate applications. The consumption of each application must be at least approx. 1.0 kg / m2, in which case the total consumption is at least 2.0 kg / m2. The actual dry film thickness must be min. 1.0 mm.
The drying time between coats of ELAPROOF + SAND depends largely on the conditions at the installation site. At conditions of approx. + 20 °C, 50% RH can be applied a second time approx. 5 h after the first application. Lower temperatures and higher humidity significantly extend the drying time.
The ELAPROOF + SAND floor covering applied twice can be applied after approx. 12 hours in conditions + 20 °C, 50 % RH.
Topcoat
The dried ELAPROOF coating is treated with clear ELACOAT TOPCOAT or tinted ELACOAT TOPCOAT RAL topcoats to facilitate cleaning and maintenance. For monochromatic floors, we recommend topcoating with tinted ELACOAT TOPCOAT RAL topcoat to even out any colour differences in the ELAPROOF + SAND coating. On flaked floors, we recommend flaking with ELAPROOF PVA paint flakes on wet ELACOAT TOPCOAT RAL topcoat and, after drying, finishing with clear ELACOAT TOPCOAT topcoat.
In the topcoat, the topcoat component A is first mixed for 1 to 2 minutes, then the hardener component B is added to the mixed A component and mixed again for 2-3 minutes. Use, for example, the COLLOMIX KR series mixing paddle for mixing.
The mixture is applied on top of the dried ELAPROOF coating with a short-pile roller (6 – 7 mm) by cross-rolling. The consumption of the topcoat is approx. 110 – 200 g / m2 / application, depending on the degree of roughness of the selected ELAPROOF + SAND coating. The topcoat is dry to dry after approx. 16 h at + 20 °C, 50% RH. The full duration of mechanical stress is achieved under the above conditions in about 4 days and the full chemical duration in about 7 days.
NOTE! Some shades of ELACOAT TOPCOAT RAL topcoats may require 2 to 3 coats to achieve sufficient coverage! See a separate table for the coverage of ELACOAT TOPCOAT RAL topcoats.
Build Care Oy owns all rights to this coating work method. Designers are free to use this coating work method when creating repair and coating plans!
ALWAYS READ THE PRODUCT DESCRIPTIONS FOR THE PRODUCTS PRESENTED IN THE COATING WORK METHOD BEFORE STARTING THE INSTALLATION!
Structural drawings
All structural drawings related to ElaProof products in DWG and PDF format from the ProdLib-service.
Updated: 01/2022 | JKo
4.4 Brick wall coating (dry rooms)
General
This coating work method is indicative and deals with the coating of a brick wall with the ELAPROOF + SAND system. The ELAPROOF + SAND wall covering system consists of ELAPROOF PRIMER primer, ELAPROOF + SAND wall covering and ELACOAT TOPCOAT RAL / ELACOAT TOPCOAT topcoat
The coating work method is not a repair plan or a construction plan. The overall design of the coating is always the responsibility of the site-specific designer.
Platform refurbishment
In areas to be renovated, all possible moisture-sensitive adhesive residues must be removed from the brick wall. Any loose floor screeds must also be removed in their entirety.
Any gaps between the boards, screw holes and cracks in the board surfaces must be filled / levelled with a floor level suitable for brick surfaces. A floor level suitable for brick surfaces should also be used for possible over-levelling. When using screeds, also check with the floor screed manufacturer for a suitable primer.
Primer
Prior to coating, cleaned and repaired brick substrates are primed with ELAPROOF PRIMER diluted 1: 2 with water (1 part primer: 2 parts water). The primer may be damp before applying ELAPROOF + SAND.
Brick walls painted with a good quality primer do not need to be primed separately. Old primer or topcoat coats can be sanded mechanically or treated with suitable washing liquid to ensure adhesion of ELAPROOF + SAND Wall covering. In these cases, it is also recommended to carry out a separate adhesion test before treating larger areas, to ensure that the adhesion between ELAPROOF + SAND Wall covering and the paint and at the same time sufficient adhesion of the original paint to the substrate after the coating is applied.
Coating
Before starting the coating, the ELAPROOF + SAND Wall covering must be mixed. Use a mixing paddle in the mixer that does not take air into the sealant when mixing, eg COLLOMIX KR series mixing paddle.
The primed substrate is coated with ELAPROOF + SAND (M1 / EC 1) wall coating. The coating is applied to the substrate with a steel spatula.
ELAPROOF + SAND Wall covering is applied to the substrate in two separate applications. The consumption of each application must be at least approx. 1.0 kg / m2, in which case the total consumption is at least 2.0 kg / m2. The actual dry film thickness must be min. 1.0 mm.
The drying time between coats of ELAPROOF + SAND depends largely on the conditions at the installation site. At conditions of approx. + 20 °C, 50% RH can be applied a second time approx. 5 h after the first application. Lower temperatures and higher humidity significantly extend the drying time.
The ELAPROOF + SAND Wall covering applied twice can be applied after approx. 12 hours in conditions + 20 °C, 50 % RH.
Topcoat
The dried ELAPROOF coating is treated with clear ELACOAT TOPCOAT or tinted ELACOAT TOPCOAT RAL topcoats to facilitate cleaning and maintenance. For monochromatic floors, we recommend topcoating with tinted ELACOAT TOPCOAT RAL topcoat to even out any color differences in the ELAPROOF + SAND coating. On flaked floors, we recommend flaking with ELAPROOF PVA paint flakes on wet ELACOAT TOPCOAT RAL topcoat and, after drying, finishing with clear ELACOAT TOPCOAT topcoat.
In the topcoat, the topcoat component A is first mixed for 1 to 2 minutes, then the hardener component B is added to the mixed A component and mixed again for 2-3 minutes. Use, for example, the COLLOMIX KR series mixing paddle for mixing.
The mixture is applied on top of the dried ELAPROOF coating with a short-pile roller (6 – 7 mm) by cross-rolling. The consumption of the topcoat is approx. 110 – 200 g / m2 / application, depending on the degree of roughness of the selected ELAPROOF + SAND coating. The topcoat is dry to dry after approx. 16 h at + 20 °C, 50% RH. The full duration of mechanical stress is achieved under the above conditions in about 4 days and the full chemical duration in about 7 days.
NOTE! Some shades of ELACOAT TOPCOAT RAL topcoats may require 2 to 3 coats to achieve sufficient coverage! See a separate table for the coverage of ELACOAT TOPCOAT RAL topcoats.
Build Care Oy owns all rights to this coating work method. Designers are free to use this coating work method when creating repair and coating plans!
ALWAYS READ THE PRODUCT DESCRIPTIONS FOR THE PRODUCTS PRESENTED IN THE COATING WORK METHOD BEFORE STARTING THE INSTALLATION!
Structural drawings
All structural drawings related to ElaProof products in DWG and PDF format from the ProdLib-service.
Updated: 01/2022 | JKo
4.3 Concreate wall coating (dry rooms)
General
This coating work method is indicative and deals with the coating of a concreate wall with the ELAPROOF + SAND system. The ELAPROOF + SAND wall covering system consists of ELAPROOF PRIMER primer, ELAPROOF + SAND wall covering and ELACOAT TOPCOAT RAL / ELACOAT TOPCOAT topcoat
The coating work method is not a repair plan or a construction plan. The overall design of the coating is always the responsibility of the site-specific designer.
Platform refurbishment
In areas to be renovated, all possible moisture-sensitive adhesive residues must be removed from the concreate wall. Any loose floor screeds must also be removed in their entirety.
Any gaps between the boards, screw holes and cracks in the board surfaces must be filled / levelled with a floor level suitable for concreate surfaces. A floor level suitable for chipboard surfaces should also be used for possible over-levelling. When using screeds, also check with the floor screed manufacturer for a suitable primer.
Primer
Prior to coating, cleaned and repaired Concreate substrates are primed with ELAPROOF PRIMER without the addition of water. Allow the primer to dry completely before applying ELAPROOF + SAND. The purpose of the primer is to seal the surface of the concreate from the moisture released by the incoming coating.
Concreate walls painted with a good quality primer do not need to be primed separately. Old primer or topcoat coats can be sanded mechanically or treated with suitable washing liquid to ensure adhesion of ELAPROOF + SAND Wall covering. In these cases, it is also recommended to carry out a separate adhesion test before treating larger areas, to ensure that the adhesion between ELAPROOF + SAND Wall covering and the paint and at the same time sufficient adhesion of the original paint to the substrate after the coating is applied.
Coating
Before starting the coating, the ELAPROOF + SAND Wall covering must be mixed. Use a mixing paddle in the mixer that does not take air into the sealant when mixing, eg COLLOMIX KR series mixing paddle.
The primed substrate is coated with ELAPROOF + SAND (M1 / EC 1) wall coating. The coating is applied to the substrate with a steel spatula.
ELAPROOF + SAND Wall covering is applied to the substrate in two separate applications. The consumption of each application must be at least approx. 1.0 kg / m2, in which case the total consumption is at least 2.0 kg / m2. The actual dry film thickness must be min. 1.0 mm.
The drying time between coats of ELAPROOF + SAND depends largely on the conditions at the installation site. At conditions of approx. + 20 °C, 50% RH can be applied a second time approx. 5 h after the first application. Lower temperatures and higher humidity significantly extend the drying time.
The ELAPROOF + SAND Wall covering applied twice can be applied after approx. 12 hours in conditions + 20 °C, 50 % RH.
Topcoat
The dried ELAPROOF coating is treated with clear ELACOAT TOPCOAT or tinted ELACOAT TOPCOAT RAL topcoats to facilitate cleaning and maintenance. For monochromatic floors, we recommend topcoating with tinted ELACOAT TOPCOAT RAL topcoat to even out any color differences in the ELAPROOF + SAND coating. On flaked floors, we recommend flaking with ELAPROOF PVA paint flakes on wet ELACOAT TOPCOAT RAL topcoat and, after drying, finishing with clear ELACOAT TOPCOAT topcoat.
In the topcoat, the topcoat component A is first mixed for 1 to 2 minutes, then the hardener component B is added to the mixed A component and mixed again for 2-3 minutes. Use, for example, the COLLOMIX KR series mixing paddle for mixing.
The mixture is applied on top of the dried ELAPROOF coating with a short-pile roller (6 – 7 mm) by cross-rolling. The consumption of the topcoat is approx. 110 – 200 g / m2 / application, depending on the degree of roughness of the selected ELAPROOF + SAND coating. The topcoat is dry to dry after approx. 16 h at + 20 °C, 50% RH. The full duration of mechanical stress is achieved under the above conditions in about 4 days and the full chemical duration in about 7 days.
NOTE! Some shades of ELACOAT TOPCOAT RAL topcoats may require 2 to 3 coats to achieve sufficient coverage! See a separate table for the coverage of ELACOAT TOPCOAT RAL topcoats.
Build Care Oy owns all rights to this coating work method. Designers are free to use this coating work method when creating repair and coating plans!
ALWAYS READ THE PRODUCT DESCRIPTIONS FOR THE PRODUCTS PRESENTED IN THE COATING WORK METHOD BEFORE STARTING THE INSTALLATION!
Structural drawings
All structural drawings related to ElaProof products in DWG and PDF format from the ProdLib-service.
Updated: 01/2022 | JKo
4.2 Gypsum board wall coating (dry rooms)
General
This coating work method is indicative and deals with the coating of a gypsum board wall with the ELAPROOF + SAND system. The ELAPROOF + SAND wall covering system consists of ELAPROOF PRIMER primer, ELAPROOF + SAND wall covering and ELACOAT TOPCOAT RAL / ELACOAT TOPCOAT topcoat
The coating work method is not a repair plan or a construction plan. The overall design of the coating is always the responsibility of the site-specific designer.
Platform refurbishment
In areas to be renovated, all possible moisture-sensitive adhesive residues must be removed from the gypsum board wall. Any loose floor screeds must also be removed in their entirety.
Any gaps between the boards, screw holes and cracks in the board surfaces must be filled / levelled with a floor level suitable for gypsum board surfaces. A floor level suitable for chipboard surfaces should also be used for possible over-levelling. When using screeds, also check with the floor screed manufacturer for a suitable primer.
Primer
Prior to coating, cleaned and repaired Gypsum board substrates are primed with ELAPROOF PRIMER without the addition of water. Allow the primer to dry completely before applying ELAPROOF + SAND. The purpose of the primer is to seal the surface of the gypsum board from the moisture released by the incoming coating.
Gypsum board walls painted with a good quality primer do not need to be primed separately. Old primer or topcoat coats can be sanded mechanically or treated with suitable washing liquid to ensure adhesion of ELAPROOF + SAND Wall covering. In these cases, it is also recommended to carry out a separate adhesion test before treating larger areas, to ensure that the adhesion between ELAPROOF + SAND Wall covering and the paint and at the same time sufficient adhesion of the original paint to the substrate after the coating is applied.
Coating
Before starting the coating, the ELAPROOF + SAND Wall covering must be mixed. Use a mixing paddle in the mixer that does not take air into the sealant when mixing, eg COLLOMIX KR series mixing paddle.
The primed substrate is coated with ELAPROOF + SAND (M1 / EC 1) wall coating. The coating is applied to the substrate with a steel spatula.
ELAPROOF + SAND Wall covering is applied to the substrate in two separate applications. The consumption of each application must be at least approx. 1.0 kg / m2, in which case the total consumption is at least 2.0 kg / m2. The actual dry film thickness must be min. 1.0 mm.
The drying time between coats of ELAPROOF + SAND depends largely on the conditions at the installation site. At conditions of approx. + 20 °C, 50% RH can be applied a second time approx. 5 h after the first application. Lower temperatures and higher humidity significantly extend the drying time.
The ELAPROOF + SAND Wall covering applied twice can be applied after approx. 12 hours in conditions + 20 °C, 50 % RH.
Topcoat
The dried ELAPROOF coating is treated with clear ELACOAT TOPCOAT or tinted ELACOAT TOPCOAT RAL topcoats to facilitate cleaning and maintenance. For monochromatic floors, we recommend topcoating with tinted ELACOAT TOPCOAT RAL topcoat to even out any color differences in the ELAPROOF + SAND coating. On flaked floors, we recommend flaking with ELAPROOF Art&Deco Colour Chips on wet ELACOAT TOPCOAT RAL topcoat and, after drying, finishing with clear ELACOAT TOPCOAT topcoat.
In the topcoat, the topcoat component A is first mixed for 1 to 2 minutes, then the hardener component B is added to the mixed A component and mixed again for 2-3 minutes. Use, for example, the COLLOMIX KR series mixing paddle for mixing.
The mixture is applied on top of the dried ELAPROOF coating with a short-pile roller (6 – 7 mm) by cross-rolling. The consumption of the topcoat is approx. 110 – 200 g / m2 / application, depending on the degree of roughness of the selected ELAPROOF + SAND coating. The topcoat is dry to dry after approx. 16 h at + 20 °C, 50% RH. The full duration of mechanical stress is achieved under the above conditions in about 4 days and the full chemical duration in about 7 days.
NOTE! Some shades of ELACOAT TOPCOAT RAL topcoats may require 2 to 3 coats to achieve sufficient coverage! See a separate table for the coverage of ELACOAT TOPCOAT RAL topcoats.
Build Care Oy owns all rights to this coating work method. Designers are free to use this coating work method when creating repair and coating plans!
ALWAYS READ THE PRODUCT DESCRIPTIONS FOR THE PRODUCTS PRESENTED IN THE COATING WORK METHOD BEFORE STARTING THE INSTALLATION!
Structural drawings
All structural drawings related to ElaProof products in DWG and PDF format from the ProdLib-service.
Updated: 01/2022 | JKo